A factory builds a service by executing a plan: a file in the service repo that breaks an admitted spec into sessions an agent can run one at a time. The plan is the contract the driver reads at every session boundary. Whatever the plan fails to say, the driver either guesses or cannot do.

The first plan format was drafted before the spec-intake layer existed, and it assumed a world that intake did not build. It cited the spec by a path in the service repo, which by then held only a pointer. It required a status value on a key that did not exist. And it read a session budget from a spec field that no admitted spec could carry. A check that asserts a value against an absent field reads as a check and is none. That was the failure this decision exists to prevent: a format whose rules look enforced and match nothing.

  1. The plan critic is two things, split by decidability. The mechanical half is a script in the ops repo’s gate (scripts/plan-critic-check.sh): every rule a machine can decide from the plan’s text alone, one committed failing fixture per rule asserting which rule fired, a clean fixture, and fixtures for the cannot-run cases. The judgement half is an agent (plan-critic) with the planner agent as its counterpart. The split is forced: a gate runs from a plain CI step, and an agent is not resolvable from one without making the agent’s distribution a new gate input in every repo.
  2. A plan cites its spec by identity and digest, never by a path. Four keys: spec_service, spec_version, spec_sha256, spec_admitted_at. The digest is the one the intake ledger records, so the critic can reconcile it.
  3. spec_max_sessions is required, and may be the literal none-declared. A cap no spec can declare is not invented.
  4. A field whose value is a pending ruling carries unset and names its deciding session. Never a number. autonomy_level and the spend ceilings are the live cases. An omitted key reads as “not applicable”; unset is something a machine can refuse on. A plan carrying a fabricated ceiling is worse than one carrying none, because the fabricated one will be enforced.
  5. The format’s home is the gate and its clean fixture. There is no separate template to drift from the rule that checks it.
  6. The plan critic and the ADR critic stay separate agents. They judge different artifacts against different failure lists.
  7. A plan whose status is approved names its approver and its date (rule 11). An approval is a claim about a person and a day, and a claim with neither is a word. The execution half, refusing to run a plan that is not approved, is the driver’s (ADR-0007).

The mechanical rules, each with its fixture: the spec is cited by a digest the ledger can recompute; every session has a non-empty gate command and a non-empty must_not; artifacts are paths; both scope boundaries are present; retry_cap is an integer and on_exhaustion is escalate; sessions_total matches the session blocks; every depends_on names a declared session and the graph has no cycle; risk_class is in vocabulary, status and evidence are present and empty for the driver, the prompt is non-empty and human_only_actions_before is present; an approved plan names approver and date.

  • The cycle rule is fed only edges whose endpoints are both declared sessions. Without that guard a single mistyped dependency trips two rules at once, and a fixture that fires two rules proves neither.
  • Two rules were wrong when first written and their fixtures caught both. The artifact rule rejected a real root-level file name as “not a path”, and the frontmatter reader did not strip inline comments, so one rule failed a valid value while another silently skipped. Both were found by running the gate, not by reading it.
  • The approval was first lost between a merge and the file. The owner merged the first plan, and nothing flipped status to approved, because the sentence that said “merge flips the status” named an action with no actor. The lesson is general: for a cited artifact ask whether the path resolves, and for a cited action ask who or what performs the verb.
  • What rule 11 does not check. It checks the shape of an approval, not that the named approver may approve or that the date is the merge’s. Both would need an input the gate must not have.